Are there detour routes planned during construction?

With the proposed plan to maintain two-way traffic during construction on Clavey Road from US Route 41 to Green Bay Road for the duration of construction, detour routes are not anticipated. A detour is possible due to unforeseen site conditions or utility conflicts, but the duration of the detour route will be short. Please note that Clavey Road Bridge will be one-lane with a temporary traffic signal to regulate the flow of traffic. The bridge will be replaced at the completion of the project.